← Back to Projects

Wastewater Digesters

ProjectLining of Waste water Digesters in South Tehran Water & Waste Water Treatment Plant
SystemsNukote HT
Description

Another brand of polyurea from other company had been applied on the concrete surfaces which had failed because of weak quality, and bad application. After surface preparation and removing failed polyurea, suitable Epoxy primer was applied to improve adhesion. Epoxy intermediate layer was applied for filling the pores on the primed surfaces. Finally Polyurea NUKOTE - HT was sprayed on the prepared surface.

Polyurea was chosen because of good waterproofing and chemical resistance properties.

ClientTehran Province Water & Wastewater
ManufacturerNukote Coating Systems
ContractorMahab Ghods
ApplicatorArya Pooshesh Gostar
Area
LocationMiddle East