Category Commercial, Project

Imam Khomeini Airport

In this case, the main problem was that the expansion joints were not designed correctly and didn’t have a suitable joint sealant. This problem had caused cracks and severe destruction in band & runway surfaces. All deteriorated concrete sections were repaired with Epoxy grouts. Then the joints walls were cut to achieve standard width and evacuated of any loose particles. A suitable vapor barrier was applied on clean surfaces inside the joints and on the area of 2 meters around the joints. At the end Polyurea NUKOTE –ST was applied as a final Coating and then all of the joints were filled with Polyurea NUKOTE-BG, NUKOTE-ST was chosen as protective flooring because of its anti-slip surface, fastback in service excellent mechanical resistance, strong chemical resistance, and good abrasion resistance. The project was done while the runway was in full service.

Project

Repairing the deteriorated concrete and application of high performance coating on the airport runway

Systems

Nukote ST, Nukote BG

Client

International Imam Khomeini Airport

Manufacturer

---

Contractor

Jonoob Protective Coatings Co.

Applicator

---

Area

---

Location

Middle East

top

Construction

From preconstruction to virtual design and construction, we offer a wide range of services to meet your building needs.

Design - Build

Certainty of outcome. It’s why our clients choose us for their most challenging Design/Build projects.

Pre-Construction Services

From engineering to preconstruction, we offer a variety of services and delivery methods.